CCD Thickener Tank Patch Repairs

OBJECTIVE

Repair eight defects on an overflow tank with significant external wall loss due to external corrosion.

DESIGN DATA

  • Pressure 1.2 Bar
  • Temperature -6 to 75°C
  • Fuze-Dry™ Glass Fibre
  • ST3 mechanical surface preparation

EXECUTION

  • Crew of 2 x FUZE Field Personnel
  • Immediate mobilisation

Outcome

  • The engineered repairs were completed on time, providing a long-term composite repair solution in a short execution window