Cups Repair – Flare Blow Down Line

OBJECTIVE

Repair defects with significant external wall loss due to external corrosion.

DESIGN DATA

  • Pressure 4.5 Bar
  • Temperature -9 to 100 °C
  • 20 years design life
  • Fuze-Dry™ Carbon Fibre
  • Sa 2.5 abrasive blasting surface preparation

EXECUTION

  • Crew of 1x FUZE Field Supervisor
  • Immediate mobilisation

Outcome

  • The engineered repairs were completed on time and completed with specialist validation testing to meet ISO 24817 guidelines

Share: