DN80 Condensate Pipeline Repairs

OBJECTIVE

Repair multiple defects and leaks on condensate pipelines and return to service.

DESIGN DATA

  • Pressure 48Bar
  • Temperature 250°C
  • FUZE-Hot™ with Carbon Fibre
  • DN80 Steel condensate pipe
  • Bristle blaster surface preparation ST3
  • Post-curing using heat tapes

EXECUTION

  • Fuze Personnel x 2
  • Immediate mobilisation
  • 20 Year design life

Outcome

  • The engineered repairs met ISO 24817 and ASME PCC-2 code compliance.
  • Due to the high design temperature, the FUZE-Hot™ system was used, which requires post-curing heat tapes.

Share: