GRE Pipeline Repairs

OBJECTIVE

Repair multiple defects on a GRE pipeline and restore to operating condition requirements as quickly as possible.

DESIGN DATA

  • Pressure 32 Bar
  • Temperature 50°C
  • Fuze-Dry™ Glass Fibre
  • | DN100 GRE Pipeline
  • ST3 mechanical surface preparation

EXECUTION

  • Crew of 2 x FUZE Field personnel
  • Immediate mobilisation
  • 5 years design life

Outcome

  • The engineered repairs were completed on time, within budget and met ISO 24817 and ASME PCC-2 code compliance