Jetty Pile Repairs

OBJECTIVE

Remediate structural integrity of piles utilising underwater tolerant composite material.

DESIGN DATA

  • Full strength rehabilitation
  • Design Temperature 50°C
  • Fuze-Wet™ Carbon
  • ST3 surface preparation

EXECUTION

  • Crew of 1x FUZE Field Supervisor
  • Crew of 2x Trained Divers
  • Immediate mobilisation
  • 20 years design life

Outcome

  • The engineered repairs were completed on time providing a long-term composite repair solution in a short execution window.

Share: