OBJECTIVE

Repair 4 injection lines, immediately off the valve body, that were compromised and require structural and leak sealing reinforcement.

DESIGN DATA

  • Pressure 35 – 55 Bar
  • Temperature 0 to 60 °C
  • Fuze-Dry™ Glass Fibre
  • Sa2.5 abrasive blasting surface preparation

EXECUTION

  • Crew of 1x FUZE Field Supervisor
  • Immediate mobilisation
  • Leak sealing
  • Limited Landing

Outcome

  • The engineered repairs were completed on time, providing a long-term composite repair solution in a short execution window.