Leak seal, reach operating condition requirements as quickly as possible.
DESIGN DATA
Pressure 10.5 Bar
Temperature 35°C
Fuze-Dry™ Glass Fibre
HDPE 1.050mm diameter
ST3 mechanical surface preparation.
EXECUTION
Crew of 4 x FUZE Field personnel, day/night shifts
Immediate mobilisation
Operating within 2 days
Design conditions completed once live
Outcome
The engineering was completed while mobilisation occurred and the repair met ISO 24817 and ASME PCC-2 code compliance, including the supporting adhesion test data for HDPE